RENOVATION OF “REMISE” (WIENER LINIEN’S TRANSPORTATION MUSEUM)

Cegelec has upgraded the electrical engineering and safety elements of “Remise”, helping to ensure that it remains an attractive event location.

RENOVATION OF “REMISE” (WIENER LINIEN’S TRANSPORTATION MUSEUM)

KEY DATA:

  • Customer: Wiener Linien GmbH & Co KG
  • Performance period: 2012 – 2014
  • Construction site: “Remise”, Wiener Linien’s transportation museum

DESCRIPTION:

Renovation of the following parts of the building: exhibition and maintenance rooms, administration building, cleaning hall and the cash desk building for the new transport museum.

During the renovation of the “Remise” transportation museum, the energy distribution system and safety lighting were adapted to meet the latest standards.

SCOPE OF DELIVERY AND SERVICE:

  • Renovation of the building sections belonging to Remise: cash desk building (old and new), exhibition and maintenance rooms (=event area), administration building, cleaning hall
  • New low-voltage main distribution system with transducer cabinet
  • New network distributor & data cabling
  • Supply cabling for the exhibition modules
  • LED lighting for the exhibition
  • Installation of safety & guidance lighting (incl. main control rooms and sub-centres plus cabling)