INTELLIGENT LIGHT DESIGN FOR PRODUCTION HALL 7 AT BOMBARDIER (VIENNA).

The replacement of the hall lighting, taking into account the construction specifications such as available mounting points and the height of lights.

INTELLIGENT LIGHT DESIGN FOR PRODUCTION HALL 7 AT BOMBARDIER (VIENNA).

KEYDATEN:

  • Customer: Bombardier Transportation Austria GmbH
  • Performance period: Q4-2018
  • Construction site: 1220 Vienna

DESCRIPTION:

  • Converting the old hall lighting to a new LED lighting concept with automatic adjustment of the illumination intensity up to 500 lx
  • Improvement to the uniformity of the light and increase in the illumination intensity
  • Presence control: can be extended

SCOPE OF DELIVERY AND SERVICE:

  • Development of a new lighting concept
  • Removal of the old lighting
  • Installation of new LED lighting
  • Programming and commissioning of the automatic lighting control